 |
|
|
|
 |
 |
 |
| Clean
the surface from any dust, sand, oil, grease, mildew and
any loose material. |
 |
*
Inspect well the working surface. To even or patch any
cracks or crevices use a cement mortar with a spatula
or trowel and allow it to dry for 24 hours.
* Apply the first coat of IMPERFLEX® uniformly using
a medium hair roller or a soft paint brush. Allow it to
dry for 4 hours and then apply the second coat of IMPERFLEX®
brushing it crosswise to the direction of the direction
of the strokes of the coat, allow to dry 6 hours and avoid
any transit over the area for 24 hours. |
 |
 |
 |
|
 |
|
Copyright
© 2004. Todos los derechos reservados.
Grupo Abrusci, C.A. - Imperflex |
|
|